Resulting from manufacturing issues, shipping and delivery delays occurred for some J 35D subsystems, causing the two Preliminary J 35D series being sent with only parts of the prepared avionics installed.Right before it absolutely was made a decision to create the JAS 39 Gripen during the late 1970s, an intensive analyze was undertaken on an AJ 35